Overview
As demand grows, older networks become overloaded and lossy. System strengthening works relieve that load by splitting feeders, adding transformers and replacing weak sections, all while keeping supply running for consumers.
We plan these works closely with utility engineers, sequencing shutdowns so that disruption to consumers is kept to a minimum.
Scope of work
- Feeder bifurcation and new link lines
- Reconductoring of overloaded sections
- Additional distribution transformers for load relief
- Conversion of bare LT lines to AB cable
- Interlinking of feeders for back-feed options
- Replacement of damaged poles and structures
- Works planned around utility shutdown schedules
- Testing and recharging of the strengthened network
How we deliver
Joint site survey with the utility, then drawings, materials and schedule for approval.
Skilled crews carry out the works under safety supervision and stage-wise quality checks.
Every installation is tested, inspected and commissioned before formal handover.
Common questions
How do you reduce disruption during strengthening works?
Do these works help reduce losses?
Related services
Substation Construction
Civil and electrical works for new 33/11 kV substations, bay extensions and capacity upgrades.
View detailsHT & LT Line Works
Erection of overhead and underground HT and LT lines, poles, conductors and cabling.
View detailsRural Electrification
Bringing reliable power to villages and agricultural feeders under state and central schemes.
View details