
Overview
A well-erected transformer centre lasts for years with little attention. We build the structure, mount the transformer, fit the protection and switchgear, and complete the earthing so the installation is safe from the day it is charged.
We also replace and enhance existing transformers where load has grown beyond capacity.
Scope of work
- Plinth or double-pole structure erection
- Mounting of distribution transformers
- AB switch, drop-out fuse and lightning arrester fitting
- Earthing pits and earthing connections
- LT distribution box and cable connections
- Transformer enhancement and replacement
- Pre-commissioning tests
- Charging and handover
How we deliver
Joint site survey with the utility, then drawings, materials and schedule for approval.
Skilled crews carry out the works under safety supervision and stage-wise quality checks.
Every installation is tested, inspected and commissioned before formal handover.
Common questions
Do you take up transformer enhancement?
Is earthing part of the scope?
Related services
Substation Construction
Civil and electrical works for new 33/11 kV substations, bay extensions and capacity upgrades.
View detailsHT & LT Line Works
Erection of overhead and underground HT and LT lines, poles, conductors and cabling.
View detailsRural Electrification
Bringing reliable power to villages and agricultural feeders under state and central schemes.
View details